C1 installation instructions for Alliance, Speed Queen, UniMac, Huebsch, Primus, IPSO

 

Purpose:  Two part process to enable Alliance machines with MDC controllers to accept PayRange.

 

Part 1 of 2:

Parts Required: 

BluKey Pulse Pro

C1 Harness

Screen_Shot_2022-05-02_at_1.12.40_PM.jpg

C1 Harness parts:

Screen_Shot_2022-05-03_at_8.45.26_AM.jpg

Machine Controller Sample:

Screen_Shot_2022-05-02_at_7.03.37_PM.jpg

Instructions:

Step 1: Disconnect power from machine.

Step 2: Open Control Panel to access control board (usually located behind machine display)

Step 3: Connect C1 harness to BluKey Pro

Screen_Shot_2022-05-02_at_1.39.19_PM.jpg

Step 4: Plug the 7-pin debit connector from C1’s harness into machine debit interface.

Screen_Shot_2022-05-02_at_1.42.15_PM.jpg

Step 5: Unplug the 4-pin connector (H1) from the controller.

Screen_Shot_2022-05-02_at_2.00.27_PM.jpg

Step 6: Insert P1 pins into the 4-pin connector to obtain power for the BluKey.  Note:  Connect power to machine’s 4-connector only and pins must be inserted in correct orientation.

Screen_Shot_2022-05-02_at_2.08.50_PM.jpg

Step 7: Disconnect machine’s 12-pin male connector from controller and plug into C1’s 12-pin female connector.

Step 8: Plug opposite side of C1’s 12-pin male connector to the controller (Do not connect if machine does not accept coins or cash reporting is not desired).

Screen_Shot_2022-05-02_at_2.14.23_PM.jpg

Step 9: Power on machine while control panel is open to verify BluKey LED light is blue.

Step 10:  Machine Programming:

Screen_Shot_2022-05-02_at_2.21.12_PM.jpg

 

Part 2 of 2:  Registering devices and adding decals

Was this article helpful?
0 out of 0 found this helpful

Comments

0 comments

Article is closed for comments.